POWER INTERRUPTION
DATE: October 24, 2020 (Saturday)
TIME: 08:30AM to 05:00PM (9.5hours)
Scope of Work: To facilitate the laying-out of 336.4MCM wire along Ponduan-Sta. Teresita Highway.
AFFECTED Area:
Brgy. Sta. Teresita and Along Ponduan-Sta. Teresita Highway
AFFECTED LC’s:
0221 3320 0219 0306 0307 0308 3739 0309 0310 0311 3890 0312 3818