POWER INTERRUPTION
DATE: November 28, 2020 (Saturday)
Scope of Work: To facilitate the laying-out of 336 MCM wire along Del Pilar Highway.
SCHEDULE #1: 08:30AM to 05:00PM (8.5hours)
Affected Areas:
Part of Ponduan and Del Pilar Highway from stop light to Shell
Affected LC’s:
0137 1867 2254 2474 2906 0297 0298 0299 0300 0301 3025 0302 0303
0305 0295 1335 0222 3919 1333 1334 1332 3942
SCHEDULE #2: 08:30AM to 09:00AM (30minutes) - shifting of loads
04:30PM to 05:00PM (30minutes) - shifting back of loads
Affected Areas:
Along Hotel Del Pilar to Camp Olivas, Sta Monica, EMS Barrio, Brgy. San Nicolas, Sitio Tagulud, Del Pilar after Shell Gas station to Del Pilar Tinajero, New Market, Brgy. Sta Teresita and Along Ponduan – Sta. Teresita Highway
Affected Commercials:
Camp Olivas, Long Last, Petron, Hotel Del Pilar, Pampanga EENT, Power Tiger Gas Station, Glasco Mirror Corp, Lucky Star, TSF TSCI Terminal, 5J’s Chicken Dealer and Millet Bldg.
Affected LC’s:
0078 3579 3766 3175 0058 0045 0091 0093 1372 3975 0094 1379 0026
0027 3963 0098 3532 3619 3920 0097 0100 0101 0023 2439 0024 0025
0102 0021 0022 0010 0011 0018 0008 0009 0103 0019 3950 0015 0017
0020 2472 2940 3938 3658 0105 0107 0104 0108 0109 0095 0106 0111
0117 0126 0127 0116 3874 0112 0128 0129 0130 0131 2155 2609 3814
3792 0456 2284 3112 0081 0083 0085 2336 3843 0086 0089 2881 3724
0087 2017 0088 2228 0221 3220 0219 0306 0307 0308 3739 0309 0310
0311 3890 0312 3818